This second configuration divides the Crystal Enterprise processing load in a logical manner, based on the types of work performed by each server. In this way, you prevent the server components from having to compete with each other for the same hardware and processing resources. In addition, this scenario prepares your system for further expansion to provide redundancy.
Note: It is recommended that you use three multi
These are the general steps to setting up this configuration:
Tip: Here, the Event Server is installed on the same machine as the APS. In general, however, the Event Server should be installed on the machine where your monitored, file